|
|
i |
|
The Lord's people both at home and
abroad have need of your help. Ridge Haven missions projects provide a
special US-based opportunity for individuals, churches, presbyteries,
Men of the Covenant groups, WIC groups, Sunday School classes, youth
groups, RUF, and other campus groups. All individuals and/or groups are
provided free lodging during participation in Ridge Haven work and
missions projects. Meals are not provided. The work
that is performed serves not only present needs but future
generations. Ministry in, among, and to the Lord's people receives and
gives blessings not only for the present but for eternity. Since 1994
more that a dozen different projects have been completed including
cafeteria renovation, Iverson Lodge renovation and new porch, new
roofs on five buildings, new re-shelter steps, trail improvements, and
the entrance-island landscaping.
We invite you and/or
your group to join the hundreds who have made Ridge Haven Missions
Projects their own mission trip and project.
Missions
Projects:
| u |
*Special Dining Hall Projects
During the late winter and spring of 2007, special crews
consisting of skilled carpenters, an electrician, a plumber, and
a stone mason will be needed to construct and reconstruct
several new features to the dining hall including new stairs,
decks, and stone work. "Helpers" will also be needed to do these
projects. |
| |
|
| u |
Project: Build outdoor
bank-steps at Averett building
Project description: Building railroad-tie steps with
handrails into 50 feet of sloping bank at the side of the
Averett building.
**Material costs: Pressure treated 2x4's and 4x4's for
handrails. (Anticipated cost less than $200.)
Anticipated work-hours to complete: 2-3 days for 2-3 people. |
| |
|
| u |
Project: Landscape RV
park
Project description:
Based on previously adopted landscape re-design and needed heavy
equipment use, plant and transplant bushes and trees; clear areas
of underbrush; create clear, hazard-free, attractive path to
near-by laundry house; seed and straw appropriate areas.
Material costs:
Fertilizers, seeds, straw, heavy equipment contract, etc.
(anticipated cost less than $1,500).
Anticipated work-hours:
3-4 working days for 4-6 people. |
| |
|
| u |
*Project: Control soil erosion and landscape
Averett-Robeson banks and yard (Project partially completed)
Project description: Planting and transplanting
bushes, and trees according to previously approved landscape
design; repairing small eroded and washed out areas; putting down
wood chips, etc.
**Material costs: Fertilizers and plants, etc.
(Anticipated cost less than $2,000 for landscape-size shrubs and
trees.)
Anticipated man hours: 2-3 working days for 3-5
persons. |
| |
|
| u |
Project: Control
erosion and landscape Cassels Building front parking lot bank
Project description:
Site preparation including repairing eroded and washed out areas,
seeding, and strawing.
**Material costs: Negligible.
Anticipated man hours:
Half day for 1-2 persons. |
| |
|
|
u |
Project: Make and place
split-rail fence at 3-4 sites
Material costs: none
Anticipated work-hours to complete: 3-5 days for 2-3 people
(machine splitter available). |
| |
|
| u |
*Project: Paint
building external siding and trim
Project description:
Ridge Haven has nine (9) buildings that need external painting.
The sizes of the buildings vary. Some are one-story; some are
two-story and higher.
**Material costs: Paint
and supplies. (Anticipated cost less than $300 per building.)
Anticipated man hours:
On an average, 2-3 days for 2-3 persons per building. |
| |
|
| u |
Project: Landscape Office
Project description: Planting new plants according
to provided landscape design.
**Material costs: Plants, fertilizer, straw, etc.
(Anticipated cost $1,500.)
Anticipated man hours: 2-3 working days for 2-3
persons. |
| |
|
| u |
Project: Upgrade
miscellaneous landscape and flower beds
Project description: Pruning, weeding, working soil,
fertilizing, installing new plants, mulching, etc.
**Material costs: Plants, fertilizer, straw, etc.
(Anticipated cost $1,500.)
Anticipated man hours: 2-3 working days for 2-3
persons. |
| |
|
| u |
*Project: Grass seed Averett - Robeson drain field
Project description: Site preparation including
repairing eroded and washed out areas; grass seeding and strawing
(approximately two acres).
**Material costs: plants, fertilizer, and mulch.
(Anticipated cost less than $200.)
Anticipated man hours: 1-2 working days for 1-3
persons. |
| |
|
| u |
Project: Develop new trails
Project description: Cutting and clearing new trails through
wilderness areas on Ridge Haven property.
**Material costs: Negligible.
Anticipated man hours: 5-10 working
days for 6-20 persons. |
*Indicates a higher priority than other projects.
**Contributions toward the cost of materials and supplies are welcome
but NOT necessary for the acceptance of a project.
For information about Ridge Haven
Missions Camps & Conferences, contact us:
Phone: 1-877-862-3916
Fax: 1-828-884-6988
E-mail: ridgehaven@ridgehaven.org
|