i The Lord's people both at home and abroad have need of your help. Ridge Haven missions projects provide a special US-based opportunity for individuals, churches, presbyteries, Men of the Covenant groups, WIC groups, Sunday School classes, youth groups, RUF, and other campus groups. All individuals and/or groups are provided free lodging during participation in Ridge Haven work and missions projects. Meals are not provided.

The work that is performed serves not only present needs but future generations. Ministry in, among, and to the Lord's people receives and gives blessings not only for the present but for eternity. Since 1994 more that a dozen different projects have been completed including cafeteria renovation, Iverson Lodge renovation and new porch, new roofs on five buildings, new re-shelter steps, trail improvements, and the entrance-island landscaping. 

We invite you and/or your group to join the hundreds who have made Ridge Haven Missions Projects their own mission trip and project.

Missions Projects:
 

u *Special Dining Hall Projects
During the late winter and spring of 2007, special crews consisting of skilled carpenters, an electrician, a plumber, and a stone mason will be needed to construct and reconstruct several new features to the dining hall including new stairs, decks, and stone work. "Helpers" will also be needed to do these projects.
   
u Project: Build outdoor bank-steps at Averett building
Project description: Building railroad-tie steps with handrails into 50 feet of sloping bank at the side of the Averett building.
**Material costs: Pressure treated 2x4's and 4x4's for handrails. (Anticipated cost less than $200.)
Anticipated work-hours to complete: 2-3 days for 2-3 people.
   
u Project: Landscape RV park
Project description: Based on previously adopted landscape re-design and needed heavy equipment use, plant and transplant bushes and trees; clear areas of underbrush; create clear, hazard-free, attractive path to near-by laundry house; seed and straw appropriate areas.
Material costs: Fertilizers, seeds, straw, heavy equipment contract, etc. (anticipated cost less than $1,500).
Anticipated work-hours: 3-4 working days for 4-6 people.
   
u *Project: Control soil erosion and landscape Averett-Robeson banks and yard (Project partially completed)
Project description: Planting and transplanting bushes, and trees according to previously approved landscape design; repairing small eroded and washed out areas; putting down wood chips, etc.
**Material costs: Fertilizers and plants, etc. (Anticipated cost less than $2,000 for landscape-size shrubs and trees.)
Anticipated man hours: 2-3 working days for 3-5 persons.
   
u Project: Control erosion and landscape Cassels Building front parking lot bank
Project description: Site preparation including repairing eroded and washed out areas, seeding, and strawing.
**Material costs: Negligible.
Anticipated man hours: Half day for 1-2 persons.
   
u Project: Make and place split-rail fence at 3-4 sites
Material costs: none
Anticipated work-hours to complete: 3-5 days for 2-3 people (machine splitter available).
   
u *Project: Paint building external siding and trim
Project description: Ridge Haven has nine (9) buildings that need external painting. The sizes of the buildings vary. Some are one-story; some are two-story and higher.
**Material costs: Paint and supplies. (Anticipated cost less than $300 per building.)
Anticipated man hours: On an average, 2-3 days for 2-3 persons per building.
   
u Project: Landscape Office
Project description: Planting new plants according to provided landscape design.
**Material costs: Plants, fertilizer, straw, etc. (Anticipated cost $1,500.)
Anticipated man hours: 2-3 working days for 2-3 persons.
   
u Project: Upgrade miscellaneous landscape and flower beds
Project description: Pruning, weeding, working soil, fertilizing, installing new plants, mulching, etc.
**Material costs: Plants, fertilizer, straw, etc. (Anticipated cost $1,500.)
Anticipated man hours: 2-3 working days for 2-3 persons.
   
u *Project: Grass seed Averett - Robeson drain field
Project description: Site preparation including repairing eroded and washed out areas; grass seeding and strawing (approximately two acres).
**Material costs: plants, fertilizer, and mulch. (Anticipated cost less than $200.)
Anticipated man hours: 1-2 working days for 1-3 persons.
   
u Project: Develop new trails
Project description: Cutting and clearing new trails through wilderness areas on Ridge Haven property.
**Material costs: Negligible.
Anticipated man hours: 5-10 working days for 6-20 persons.

*Indicates a higher priority than other projects.
**Contributions toward the cost of materials and supplies are welcome but NOT necessary for the acceptance of a project.

 